Wimbledon SW19 – Full House Refurbishment & Loft Conversion

  • Location: Wimbledon, London SW19
  • Completion Date: August 2025
  • Project Duration: 6 months
  • Client Type: Private Residential

Project Overview

This project comprised a comprehensive full-house refurbishment and loft conversion to a private residential
property in Wimbledon. The works were designed to enhance space, natural light, and functionality while delivering
a refined, contemporary interior suited to modern family living.

Client Brief

The client requested a complete modernisation of the property, including upgraded living areas, additional bedroom
accommodation, and improved circulation. The brief focused on creating calm, elegant interiors with high-quality
finishes, maximising daylight, and maintaining a cohesive design throughout the home.

Scope of Works

  • Full internal strip-out and refurbishment across all floors
  • Loft conversion with new bedroom and en-suite bathroom
  • Installation of bespoke staircases and upgraded balustrades
  • New bathrooms, en-suites, and guest WC installations
  • Electrical, plumbing, and mechanical system upgrades
  • Joinery, decoration, and final finishes throughout

Materials & Finishes

  • Engineered oak herringbone flooring throughout principal areas
  • Bespoke joinery, wardrobes, and fitted storage
  • Natural stone and quartz bathroom finishes
  • High-quality sanitaryware with brass and brushed metal fittings
  • Contemporary lighting, skylights, and roof windows

Result

The completed refurbishment delivered a bright, elegant, and highly functional family home, combining timeless
materials with modern detailing. The project significantly enhanced both the living quality and long-term value of
the property, providing a cohesive and refined residential environment in the heart of Wimbledon.